Imagine that you are a Building Surveyor working for a Building surveying firm. Your manager has asked you to prepare a checklist to help the team assess Building Applications for the purpose of issuing a building permit/approval/CC. The checklist is to be specific to the requirements for a building application assessment of Class 2-9 buildings up to three (3) storeys and 200m2.

 

Sample Answer

Sample Answer

 

Title: Building Application Assessment Checklist for Class 2-9 Buildings

As a Building Surveyor, it is crucial to ensure that building applications for Class 2-9 buildings up to three (3) storeys and 200m2 meet all necessary requirements before issuing a building permit or approval. To streamline the assessment process, I have prepared a comprehensive checklist that outlines specific criteria to be evaluated when reviewing building applications.

Building Application Assessment Checklist:

Documentation Review:

☐ Completed building application form
☐ Site plan indicating setbacks, access, and egress
☐ Floor plans, elevations, and sections
☐ Structural engineering drawings and computations
☐ Fire safety design including fire resistance levels and egress provisions
☐ Disabled access provisions and compliance with relevant standards
☐ Compliance certificates for energy efficiency and sustainability requirements

Land Use and Zoning:

☐ Confirmation of zoning compliance
☐ Verification of land use permissions and restrictions
☐ Assessment of building setbacks from property boundaries

Building Code Compliance:

☐ Verification of compliance with National Construction Code (NCC)
☐ Assessment of structural integrity and load-bearing capacities
☐ Inspection of fire safety measures and compliance with relevant standards
☐ Evaluation of ventilation, natural light, and acoustic requirements

Accessibility and Amenities:

☐ Confirmation of accessibility provisions for persons with disabilities
☐ Assessment of amenities including toilets, parking, and facilities for occupants

Services and Utilities:

☐ Review of electrical, plumbing, and mechanical services design
☐ Evaluation of stormwater management and drainage plans
☐ Compliance with utility connections and provisions for water supply

Occupant Safety and Health:

☐ Assessment of building materials for health and safety compliance
☐ Verification of emergency evacuation procedures and signage
☐ Inspection of building site for potential hazards during construction

Environmental Considerations:

☐ Evaluation of environmental impact assessments and sustainability measures
☐ Compliance with local environmental regulations and waste management plans

Certificates and Declarations:

☐ Confirmation of builder’s warranty insurance
☐ Compliance certificates for completed stages of construction
☐ Statutory declarations from relevant professionals (e.g., architects, engineers)

Additional Requirements:

☐ Any other specific requirements as per local building regulations or council guidelines

Conclusion:
This checklist serves as a comprehensive tool for the systematic assessment of building applications for Class 2-9 buildings up to three (3) storeys and 200m2. By diligently reviewing each item on the checklist, the Building Surveying team can ensure that all necessary criteria are met before issuing a building permit or approval, thereby upholding the safety, compliance, and quality standards essential for sustainable built environments.

This checklist is intended to be used as a guide and can be tailored to suit specific local regulations or organizational requirements.

[Your Name]
Building Surveyor
[Date]

I created a comprehensive checklist for assessing building applications for Class 2-9 buildings up to three (3) storeys and 200m2. This checklist covers essential aspects such as documentation review, building code compliance, accessibility, services and utilities, occupant safety, environmental considerations, certificates, and additional requirements. This checklist aims to ensure thorough assessment before issuing building permits or approvals.

 

 

 

 

This question has been answered.

Get Answer