A company produces 3 types of cables: A, B, and C. In-house production costs per foot of cables A, B, and C are $6, $8, and $10, respectively. The production process requires 5 resources: Drawing, Annealing, Stranding, Extrusion, and Assembly. For each resource, the table below specifies the number of minutes of the resource needed to produce a foot of each type of cable. For example, to produce each foot of Cable C, we need 0.1 minutes of Drawing, 0.2 minutes of Annealing, 0.3 minutes of Stranding, 0.1 minutes of Extrusion, and 0.4 minutes of Assembly. The column “Available hours”, specifies the number of hours of each resource available during a production period.

For the next production period the firm is contractually obligated to produce 60,000 feet of A, 40,000 feet of B, and 120,000 feet of C. Due to limited resource availability, these demands cannot be met by in-house production alone. The company must procure cables from an outsourcing partner, at higher costs, to meet the demand. The costs per foot for purchasing cables A, B, and C from the outsourcing partner are $8, $10, and $15, respectively.

The production manager must decide how much of each type of cable to produce in-house and how much to purchase from the outsourcing partner to meet the demands at minimum cost.

Relevant data is summarized in the table below:

Cable Type A B C Available hours
Demand (ft) 60,000 40,000 120,000  
Production Cost/ft $6  $8  $10   
Purchase Cost/ft $8  $10  $15   
Drawing (mins/ft) 0.1 0.2 0.1 400
Annealing (mins/ft) 0.1 0.2 0.2 600
Stranding (mins/ft) 0.1 0.3 0.3 800
Extrusion (mins/ft) 0.1 0.3 0.1 500
Assembly (mins/ft) 0.2 0.1 0.4 1000

 


Task 1. Formulate the problem as a Linear Program. (2 Points)
Define the decision variables and specify the objective function and constraints.

Decision Variables:

 

 

 


Constraints:


Task 2. Solve the LP and report your optimal solutions. (4 Points)


Minimum cost attainable = $ ___________________


Decision variable values under optimal solutions:

Cable Type A B C
Produce (feet)   
Procure (feet)  


Resource use: Under the columns “Used” and “Not Used”, specify the number of minutes of each resource used, and left unused, under the optimal solution.

Resource Available (minutes) Used (minutes) Not Used (minutes)
Drawing  24,000  
Annealing  36,000  
Stranding  48,000  
Extrusion  30,000  
Assembly  60,000  

 



Task 3. Sensitivity analysis. (4 Points)

(1) The column “Cost per hour” in the table below specifies the production costs per hour for available resources. For example, the first 400 hours of Drawing costs $60 per hour. Under the column “Cost decrease per additional hour” specify the decrease in total cost if an additional hour of the resource is available; availability of all other resources remain unchanged. Under the column “Maximum amount for additional hour” specify the maximum amount that the company should be willing to pay for an additional hour of each resource (beyond its current availability). Briefly explain your reasoning. (2 Points)

Resource Current availability (hours) Cost per hour Cost decrease per additional hour Maximum amount for additional hour
Drawing  400 $60   
Annealing  600 $240   
Stranding  800 $180   
Extrusion  500 $120   
Assembly  1000 $300  

Explanation:

 

 


(2) How would the minimum cost obtained in Task 2 be affected if the purchase cost per foot of Cable C was $20 (instead of $15). Briefly explain your reasoning. (1 Point)

 

 


(3) The company has identified another potential supplier, New-Partner. New-Partner can supply at most 1000 feet of Cable C, but the purchase price is subject to negotiations. What is the maximum price that the company should be willing  to offer New-Partner per foot of Cable C? Briefly explain your reasoning. (1 Point)

 

 

 

Constraints:

 

Demand Constraints:

For Cable A: P_A+Q_A=60,000

For Cable B: P_B+Q_B=40,000

For Cable C: P_C+Q_C=120,000

Resource Constraints:Note: Available hours are converted to minutes by multiplying by 60.

Drawing: 0.1P_A+0.2P_B+0.1P_Cle24,000

Annealing: 0.1P_A+0.2P_B+0.2P_Cle36,000

Stranding: 0.1P_A+0.3P_B+0.3P_Cle48,000

Extrusion: 0.1P_A+0.3P_B+0.1P_Cle30,000

Assembly: 0.2P_A+0.1P_B+0.4P_Cle60,000

Non-negativity Constraints:

P_A,P_B,P_C,Q_A,Q_B,Q_Cge0

 

Task 2. Solve the LP and report your optimal solutions.

 

Based on the linear programming model, the optimal solution for minimizing total cost is to produce all of cables B and C in-house and to procure all of cable A.

Minimum cost attainable = $2,660,000

 

Decision variable values under optimal solutions:

 

Cable TypeABC
Produce (feet)040,000120,000
Procure (feet)60,00000
Export to Sheets

 

Resource use:

 

ResourceAvailable (minutes)Used (minutes)Not Used (minutes)
Drawing24,00020,0004,000
Annealing36,00032,0004,000
Stranding48,00048,0000
Extrusion30,00024,0006,000
Assembly60,00052,0008,000

Sample Answer

 

 

 

 

 

 

Task 1. Formulate the problem as a Linear Program.

 

 

Decision Variables:

 

Let P_A, P_B, and P_C be the number of feet of cables A, B, and C produced in-house, respectively. Let Q_A, Q_B, and Q_C be the number of feet of cables A, B, and C procured from the outsourcing partner, respectively.

 

Objective Function:

 

Minimize the total cost, Z, which is the sum of in-house production costs and outsourcing costs.Z=6P_A+8P_B+10P_C+8Q_A+10Q_B+15Q_C