1. At which workstation is the bottleneck? (Enter the letter displayed at the upper left of each workstation box.)
  2. You want to eliminate the bottleneck, but setup times and run times cannot be changed from scenario 1 defaults. What would you change the bottleneck’s batch size to?
  3. To reduce WIP, if you could change only one workstation to Pull, which one would it be?
  4. Is FGI at the retailer higher when all stations are Push or Pull?
  5. What is the minimum batch size for all stations that results in the lowest total costs, while maintaining zero Stockouts?
  6. Do you agree that increasing setup time decreases total costs?
  7. For any given setup time, at what batch size do pending requests peak?
  8. What is the optimum batch size at which costs are minimized, with no Stockouts?
  9. Is cost of carrying WIP lower when all stations are Push or Pull?
  10. Which one has the lowest costs, with no stockouts, all Push, all Pull, or combination of Push & Pull?

● Which Scenario did you select and why?

● Did you make any adjustments along the way, and if so what was the impact?

● Where are the bottlenecks in the “pull” model ve the “push” model? What impact might this have on production?